Colorado Talking Book Library

Iconergy installed a building automation system (BAS) at the Colorado Talking Book Library and incorporated additional energy saving and comfort improving features via the BAS that addressed long-standing client concerns.

Iconergy installed a building automation system (BAS) at the Colorado Talking Book Library and incorporated additional energy saving and comfort improving features via the BAS that addressed long-standing client concerns.

Read More

City of Fort Collins: Museum of Discovery

Commissioning  services were performed for the museum's de-humidification system's design and installation. Iconergy's subsequent monitoring-based commissioning services for the whole building enabled the museum to meet changing thermal comfort and operational needs associated with rotating exhibits as well as unlocking additional energy savings for this LEED Platinum building.

Commissioning¬† services were performed for the museum’s de-humidification system’s design and installation. Iconergy’s subsequent monitoring-based commissioning services for the whole building enabled the museum to meet changing thermal comfort and operational needs associated with rotating exhibits as well as unlocking additional energy savings for this LEED Platinum building.

Read More

Ralph L. Carr Colorado Judicial Center

LEED Fundamental and Enhanced Commissioning, measurement and verification, and thermal comfort verification services were performed for the 694,859 square foot state courthouse. Additionally, our team performed monitoring-based commissioning using SkySpark. The Judicial Center encompasses the Colorado Supreme Court, the Colorado Court of Appeals, and numerous judicial and legal agencies. This project achieved LEED BD+C: New Construction v3 - LEED 2009 Gold certification.

LEED Fundamental and Enhanced Commissioning, measurement and verification, and thermal comfort verification services were performed for the 694,859 square foot state courthouse. Additionally, our team performed monitoring-based commissioning using SkySpark. The Judicial Center encompasses the Colorado Supreme Court, the Colorado Court of Appeals, and numerous judicial and legal agencies. This project achieved LEED BD+C: New…

Read More

Owens Corning

Iconergy performed an Investment Grade Audit (IGA) to identify cost saving opportunities as well as address long term infrastructure needs. Various energy conservation measures at the facility were identified and implemented.

Iconergy performed an Investment Grade Audit (IGA) to identify cost saving opportunities as well as address long term infrastructure needs. Various energy conservation measures at the facility were identified and implemented.

Read More

Empowerment on Lowry

Iconergy's design-build scope of work included new appliances, low flow water fixtures, boilers retrocommissioning, new programmable thermostats, lighting upgrades, and all new windows.

Iconergy’s design-build scope of work included new appliances, low flow water fixtures, boilers retrocommissioning, new programmable thermostats, lighting upgrades, and all new windows.

Read More

Empowerment on Logan

Iconergy's design-build retrofit scope of work for this character-filled apartment property included the following: New LED lighting inside and out, low flow water fixtures, and weatherization.

Iconergy’s design-build retrofit scope of work for this character-filled apartment property included the following: New LED lighting inside and out, low flow water fixtures, and weatherization.

Read More

Breckenridge Mountain Inn

Iconergy completed commissioning for this 4-story 110,000 SF Hotel in Breckenridge, CO. The commissioning met IECC commissioning requirements. The systems included in the commissioning scope were air handlers, heating plant, pumps, fans, makeup air units, heat exchangers, suite air conditioning units, occupant sensors, time-switches, and daylight responsive lighting.

Iconergy completed commissioning for this 4-story 110,000 SF Hotel in Breckenridge, CO. The commissioning met IECC commissioning requirements. The systems included in the commissioning scope were air handlers, heating plant, pumps, fans, makeup air units, heat exchangers, suite air conditioning units, occupant sensors, time-switches, and daylight responsive lighting.

Read More

Breckenridge Grand Vacations

Performed a turnkey design-build retrofit for this 8-building complex. Iconergy developed and executed a scope of work via an Investment Grade Audit and subsequent Performance Contract. Many energy conservation measures (ECMs) were implemented such as retrofitting exterior and parking garage lighting, insulation, and replacing boilers. Phase 1 over-performed guaranteed savings by more than 10%.

Performed a turnkey design-build retrofit for this 8-building complex. Iconergy developed and executed a scope of work via an Investment Grade Audit and subsequent Performance Contract. Many energy conservation measures (ECMs) were implemented such as retrofitting exterior and parking garage lighting, insulation, and replacing boilers. Phase 1 over-performed guaranteed savings by more than 10%.

Read More

AHEC Tivoli Theater

Iconergy commissioned this 105,765 square-foot facility, which houses student support, theatre, and a visitor center. This project achieved LEED BD+C: New Construction v3 - LEED 2009 Gold certification.

Iconergy commissioned this 105,765 square-foot facility, which houses student support, theatre, and a visitor center. This project achieved LEED BD+C: New Construction v3 – LEED 2009 Gold certification.

Read More