Archive for January 2018
Clear Creek County – Countywide Retrofits
Iconergy partnered with Clear Creek County to develop and utilize an energy performance contract to optimize the performance of all of the County’s facilities. Total estimated annual savings are roughly 36% of the baseline electric consumption, 16% of the baseline electric demand, and 25% of the baseline natural gas use. The total verified annual savings…
Read MoreUniversity of Wyoming, Energy and Engineering Research Building
Fundamental and Enhanced Commissioning services were performed for this newly constructed 100,100 square foot teaching and research laboratory. The four-story facility will include reconfigurable research laboratories, active-learning classrooms, an active-learning wet laboratory, a drilling and completions simulation laboratory, an advanced manufacturing laboratory, student project spaces, a student innovation center, a student entrepreneurship center, informal collaboration…
Read MoreUniversity of Wyoming, Science Initiative
The new Science Initiative facility is planned to be a five‐story, 147,000 square foot research facility comprised of laboratories, a vivarium, a rooftop greenhouse, a 200‐seat active‐learning classroom, and student collaboration areas. Our team performed commissioning services for the building.
Read MoreUniversity of Wyoming, Michael B. Enzi STEM Building
Iconergy provided commissioning services for the three-story Michael B. Enzi STEM Building. The facility is 107,000 square feet and comprised of laboratories, classrooms, and offices to support the chemistry, life sciences, and physics and astronomy departments.
Read MoreUniversity of Wyoming, High Bay Research Facility
Iconergy provided commissioning services for the 90,000 square foot research laboratory that supports the Center of Innovation for Flow Through Porous Media, improved oil recovery, Geomechanics and structural engineering.
Read More