Archive for January 2021
Colorado Department of Personnel and Administration
Iconergy is performing an efficiency retrofit under an energy performance contract for the State of Colorado’s capitol building and more than a dozen affiliated state agency facilities managed by the Colorado Department of Personnel and Administration. In total, there are 18 buildings that comprise over 1,811,866 square feet. Phase I of this project was to…
Read MoreHaxtun School District RE-2J
An Energy Performance Contract was performed for the 94,982 square foot PK-12 school and adjacent vocational – agricultural building. Iconergy guided the grant applications and technical presentations for funding these facilities’ improvements. Energy conservation measures including mechanical systems, roofing, control systems, and lighting have been implemented and Iconergy is currently performing measurement and verification for…
Read MoreLarge Corporate Client
Iconergy performed retro-commissioning for this large, multi-facility 1.2M square foot office building campus in Chicago. This site has multiple large central water-cooled chiller plants, multiple campus boiler plants, and dozens of air handling units that are a mix of dual duct and single duct VAV systems. Iconergy identified numerous energy conservation measures with a total…
Read MoreNew Belgium Brewing Company
The New Belgium Brewery is a nearly 200,000 square foot large campus dedicated to brewing beer and includes administrative offices, tasting room, brewing spaces, a bottling building, and a process water treatment facility. Iconergy performed retro-commissioning of the company’s facilities and identified numerous measures to save energy and improve operations. The overall project had less…
Read MoreKiowa County Hospital District, Weisbrod Hospital
Iconergy was selected to perform a turnkey retrofit of the Weisbrod Hospital via a Performance Contract. Phase One of the project is a $1.5M MEP and controls retrofit project that will address thermal comfort, control ability, and egress issues while also finding utility savings via lighting, mechanical, and roofing/envelope systems.
Read MoreColorado Mesa University, Health Sciences
Commissioning services were performed for this state-of-the-art education space for health science certificate and degree programs and is comprised of mock clinic spaces including patient simulation labs, an x-ray laboratory, classrooms, computer labs, and administrative offices. The project was a major renovation of a 39,000 square foot former community hospital as well as a new…
Read MoreAGC Biologics (AstraZeneca)
Iconergy provided operational and efficiency assistance to MedImmune (AstraZeneca) to improve its Boulder Manufacturing Center. The Iconergy retro-commissioning study encompassed both past energy studies performed on this facility as well as both preexisting and new systems as the site was converted to a new industrial use. Systems evaluated included chillers and pumps, building steam systems,…
Read MoreUnited States Olympic & Paralympic Museum
The United States Olympic and Paralympic Museum is truly a world class venue, which does a beautiful job of highlighting our athletes, as well as embodying the environmental stewardship Colorado is known for. Iconergy lead LEED energy modeling and commissioning for the 60,000 square foot museum. The museum is comprised of multiple exhibit halls, a…
Read MoreWyoming State Capitol Complex
Iconergy provided commissioning services for the Wyoming State Capitol Complex, which is a historical building. This multi-phased project included the 60,000 square foot Capitol Building expansion, the neighboring 229,000 square foot Herschler Building and its 49,000 square foot expansion, and the new 18,000 square foot Central Utility Plant.
Read MoreBoulder County
To meet the City of Boulder Building Performance Ordinance, Iconergy performed energy audits for more than 30 county-owned facilities. The purpose of the energy audits was to identify energy conservation measures that would reduce energy consumption in the facilities and calculate the estimated implementation cost, estimated annual electricity savings, and return on investment for each…
Read More