Large Corporate Client

Iconergy performed retro-commissioning for this large, multi-facility 1.2M square foot office building campus in Chicago. This site has multiple large central water-cooled chiller plants, multiple campus boiler plants, and dozens of air handling units that are a mix of dual duct and single duct VAV systems. Iconergy identified numerous ECMs with a total potential energy savings of over 1,000,000 kilowatt-hours (kWh) per year of electricityand over 100,000 therms per year of natural gas. The total energy cost savings from these ECMs are estimated at approximately $100,000 per year and have an overall project simple payback of 0.5 years.

Iconergy performed retro-commissioning for this large, multi-facility 1.2M square foot office building campus in Chicago. This site has multiple large central water-cooled chiller plants, multiple campus boiler plants, and dozens of air handling units that are a mix of dual duct and single duct VAV systems. Iconergy identified numerous energy conservation measures with a total…

Read More

Graebel Companies, Inc.

Iconergy performed a combination Technical Energy Audit (TEA) and Retro-commissioning assessment for Graebel in Denver, Colorado, which included a one year performance period where they found energy savings through reduction in heating/cooling/humidification loads, increased economizer operations, and a reduction in run-time hours of their 412,340 sqft of office and conditioned warehouse facility space.

A Technical Energy Audit (TEA) and retro-commissioning services were provided, which included a one year performance period where they found energy savings through reduction in heating/cooling/humidification loads, increased economizer operations, and a reduction in run-time hours of their 412,340 square feet of office and conditioned warehouse facility space.

Read More

Thermo Fisher Scientific

Retro-commissioning services were performed for the Thermo Fisher laboratory and identified energy conservation measures (ECMs), principally around their cryogenic freezers and laboratory HVAC/controls systems. Iconergy leveraged Xcel Energy rebates and incentives which lowered the simple payback for the suite of measure to only 1.4 years.

Retro-commissioning services were performed for the Thermo Fisher laboratory and identified energy conservation measures (ECMs), principally around their cryogenic freezers and laboratory HVAC/controls systems. Iconergy leveraged Xcel Energy rebates and incentives which lowered the simple payback for the suite of measure to only 1.4 years.

Read More

Miller Global Properties, Dry Creek Center

Iconergy was contracted by Miller Global Properties to perform commissioning services for the seven-story, 216,811 square foot Dry Creek Center. This Class A office project was initially only a core and shell building; however, the tenant also then contracted with Iconergy to provide core and interior commissioning as well during the tenant fit out. The project earned a LEED BD+C: Core and Shell (v3) Silver certification.

Iconergy was contracted by Miller Global Properties to perform commissioning services for the seven-story, 216,811 square foot Dry Creek Center. This Class A office project was initially only a core and shell building; however, the tenant also then contracted with Iconergy to provide core and interior commissioning as well during the tenant fit out. The…

Read More

Owens Corning

Iconergy performed an Investment Grade Audit (IGA) to identify cost saving opportunities as well as address long term infrastructure needs. Various energy conservation measures at the facility were identified and implemented.

Iconergy performed an Investment Grade Audit (IGA) to identify cost saving opportunities as well as address long term infrastructure needs. Various energy conservation measures at the facility were identified and implemented.

Read More

Breckenridge Mountain Inn

Iconergy completed commissioning for this 4-story 110,000 SF Hotel in Breckenridge, CO. The commissioning met IECC commissioning requirements. The systems included in the commissioning scope were air handlers, heating plant, pumps, fans, makeup air units, heat exchangers, suite air conditioning units, occupant sensors, time-switches, and daylight responsive lighting.

Iconergy completed commissioning for this 4-story 110,000 SF Hotel in Breckenridge, CO. The commissioning met IECC commissioning requirements. The systems included in the commissioning scope were air handlers, heating plant, pumps, fans, makeup air units, heat exchangers, suite air conditioning units, occupant sensors, time-switches, and daylight responsive lighting.

Read More

Breckenridge Grand Vacations

Performed a turnkey design-build retrofit for this 8-building complex. Iconergy developed and executed a scope of work via an Investment Grade Audit and subsequent Performance Contract. Many energy conservation measures (ECMs) were implemented such as retrofitting exterior and parking garage lighting, insulation, and replacing boilers. Phase 1 over-performed guaranteed savings by more than 10%.

Performed a turnkey design-build retrofit for this 8-building complex. Iconergy developed and executed a scope of work via an Investment Grade Audit and subsequent Performance Contract. Many energy conservation measures (ECMs) were implemented such as retrofitting exterior and parking garage lighting, insulation, and replacing boilers. Phase 1 over-performed guaranteed savings by more than 10%.