Denver Health – Energy Storage

Iconergy conceptualized and provided early-design analysis for various energy storage, solar PV, and microgrid solutions on this large urban hospital campus. Some of the microgrid solutions were storage-only and others were storage with solar PV feeding into them. Each solution balanced the hospitals needs for both improved resiliency and utility savings, on a building-by-building basis. While physical space constraints limit the amount of energy storage and solar PV that can occur on site, Iconergy is partnering with Denver Health to implement strategies that make sense for them operationally, financially, and technically.

Iconergy conceptualized and provided early-design analysis for various energy storage and microgrid solutions on this large urban hospital campus. Some of the microgrid solutions were storage-only and others were storage with solar PV feeding into them. Each solution balanced the hospitals needs for both improved resiliency and utility savings, on a building by building basis.…

Read More

Haxtun Hospital District

Iconergy is currently implementing a multi-phased facility renovation program under and energy performance contract. Key outcomes for the project are to work with the hospital to develop and implement the short-term and long-term priorities that allow for optimal utility, maintenance, and operational savings.

Iconergy is currently implementing a multi-phased facility renovation program under and energy performance contract. Key outcomes for the project are to work with the hospital to develop and implement the short-term and long-term priorities that allow for optimal utility, maintenance, and operational savings.

Read More

Denver Health Hospital Authority

Iconergy was selected over seven other Energy Service Companies through the Colorado Energy Office EPC program to partner with DHHA to conduct an Investment Grade Audit which will lead to multiple phases of EPC projects including comprehensive lighting upgrades, HVAC, electrical and other health and safety upgrades. Phase I of this project, currently in development will primarily be focused on retrofits, replacements, lighting controls and other advanced lighting solutions the 2,000,000 square foot main campus and satellite facilities in downtown Denver. An anticipated Phase II will include significant HVAC, controls, electrical, plumbing, and possible renewable energy solutions.

Iconergy was selected over seven other Energy Service Companies through the Colorado Energy Office EPC program to partner with DHHA to conduct an Investment Grade Audit which will lead to multiple phases of EPC projects including comprehensive lighting upgrades, HVAC, electrical and other health and safety upgrades. Phase I of this project, currently in development,…

Read More

Colorado Department of Public Health and Environment

Since 2014, the Colorado Department of Public Health and Environment (CDPHE) has contracted Iconergy to perform various building energy engineering services for more than 20 projects for their office and laboratory spaces. Services Iconergy staff have performed include energy and water audits, lighting assessments, renewable energy assessments, commissioning, retro-commissioning, monitored-based commissioning with SkySpark to verify energy savings, and consulting. Many of these projects were completed simultaneously by Iconergy staff in order to meet the desires of CDPHE and complete projects within the contracted timeline.

Since 2014, the Colorado Department of Public Health and Environment (CDPHE) has contracted Iconergy to perform various building energy engineering services for more than 20 projects for their office and laboratory spaces. Services Iconergy staff have performed include energy and water audits, lighting assessments, renewable energy assessments, commissioning, retro-commissioning, monitored-based commissioning with SkySpark to verify…

Read More

Wray Rehabilitation and Activities Center

Iconergy implemented energy conservation measures for the Wray Rehabilitation and Activities Center. The facility houses a recreation center, occupational therapy center, and rural community center.

Iconergy implemented energy conservation measures for the Wray Rehabilitation and Activities Center. The facility houses a recreation center, occupational therapy center, and rural community center.

Read More

Prowers Medical Center

Iconergy provided forensic MEP investigation at this regional hospital in rural Colorado as part of a turnkey retro-commissioning study to determine which building systems were and were not working according to healthcare and PMC's own standards. The engineering study led to both a design-build retrofit project and a retro-commissioning implementation project. Together these implementation efforts yielded improved comfort, building operations, and energy savings. PMC was so pleased with Iconergy's work that Iconergy has continued to provide building automation controls support and ongoing commissioning services.

Iconergy provided forensic MEP investigation at this regional hospital in rural Colorado as part of a turnkey retro-commissioning study to determine which building systems were and were not working according to healthcare and PMC’s own standards. The engineering study led to both a design-build retrofit project and a retro-commissioning implementation project. Together these implementation efforts…

Read More