Focus Points Family Resource Center

Iconergy provided energy efficiency upgrades for the 26,000 square foot facility that was estimated to achieve more than $50,000 in annual energy savings. The Focus Points Family Resource Center is non-profit that provides free to low-cost youth and adult educational services for the community.

Iconergy provided energy efficiency upgrades for the 26,000 square foot facility that was estimated to achieve more than $50,000 in annual energy savings. The Focus Points Family Resource Center is non-profit that provides free to low-cost youth and adult educational services for the community.

Read More

Breckenridge Mountain Inn

Iconergy completed commissioning for this 4-story 110,000 SF Hotel in Breckenridge, CO. The commissioning met IECC commissioning requirements. The systems included in the commissioning scope were air handlers, heating plant, pumps, fans, makeup air units, heat exchangers, suite air conditioning units, occupant sensors, time-switches, and daylight responsive lighting.

Iconergy completed commissioning for this 4-story 110,000 SF Hotel in Breckenridge, CO. The commissioning met IECC commissioning requirements. The systems included in the commissioning scope were air handlers, heating plant, pumps, fans, makeup air units, heat exchangers, suite air conditioning units, occupant sensors, time-switches, and daylight responsive lighting.

Read More

Breckenridge Grand Vacations

Performed a turnkey design-build retrofit for this 8-building complex. Iconergy developed and executed a scope of work via an Investment Grade Audit and subsequent Performance Contract. Many energy conservation measures (ECMs) were implemented such as retrofitting exterior and parking garage lighting, insulation, and replacing boilers. Phase 1 over-performed guaranteed savings by more than 10%.

Performed a turnkey design-build retrofit for this 8-building complex. Iconergy developed and executed a scope of work via an Investment Grade Audit and subsequent Performance Contract. Many energy conservation measures (ECMs) were implemented such as retrofitting exterior and parking garage lighting, insulation, and replacing boilers. Phase 1 over-performed guaranteed savings by more than 10%.

Read More