Denver Health – Energy Storage

Iconergy conceptualized and provided early-design analysis for various energy storage, solar PV, and microgrid solutions on this large urban hospital campus. Some of the microgrid solutions were storage-only and others were storage with solar PV feeding into them. Each solution balanced the hospitals needs for both improved resiliency and utility savings, on a building-by-building basis. While physical space constraints limit the amount of energy storage and solar PV that can occur on site, Iconergy is partnering with Denver Health to implement strategies that make sense for them operationally, financially, and technically.

Iconergy conceptualized and provided early-design analysis for various energy storage and microgrid solutions on this large urban hospital campus. Some of the microgrid solutions were storage-only and others were storage with solar PV feeding into them. Each solution balanced the hospitals needs for both improved resiliency and utility savings, on a building by building basis.…

Read More

Haxtun Hospital District

Iconergy is currently implementing a multi-phased facility renovation program under and energy performance contract. Key outcomes for the project are to work with the hospital to develop and implement the short-term and long-term priorities that allow for optimal utility, maintenance, and operational savings.

Iconergy is currently implementing a multi-phased facility renovation program under and energy performance contract. Key outcomes for the project are to work with the hospital to develop and implement the short-term and long-term priorities that allow for optimal utility, maintenance, and operational savings.

Read More

Denver Health Hospital Authority

Iconergy was selected as Denver Health’s (DHHA) long term facility and utilities partner in 2020. The first project is to conduct an Energy Performance Contract (EPC) for a comprehensive, multi-year facilities upgrade program that will be implemented over multiple phases at Denver Health’s nearly 2.7M square feet of facilities. Phases 1 and 2 total approximately $14 million, with additional phases in development. Measures include mechanical, electrical, plumbing, and controls systems and span measures such as building analytics/diagnostic monitoring software, lighting retrofits, central plant optimization and retrofits, controls retrofits and upgrades (mechanical, lighting), and renewable energy. Denver Health is one of the largest hospitals in the State of Colorado and one of only four Level I trauma centers in the state.

Iconergy was selected as Denver Health’s (DHHA) long term facility and utilities partner in 2020. The first project is to conduct an Energy Performance Contract (EPC) for a comprehensive, multi-year facilities upgrade program that will be implemented over multiple phases at Denver Health’s nearly 2.7M square feet of facilities. Phases 1 and 2 total approximately…

Read More

Colorado State University, Center for Vector-Borne Infectious Disease

Iconergy performed LEED v4 fundamental and enhanced commissioning services for the 38,000 square foot Center for Vector‐Borne & Infectious Disease (CVID) laboratory. The research facility is comprised of BSL‐2 laboratories, animal holding rooms, office spaces, large conference room, and shared collaboration space.

Iconergy performed LEED v4 fundamental and enhanced commissioning services for the 38,000 square foot Center for Vector‐Borne & Infectious Disease (CVID) laboratory. The research facility is comprised of BSL‐2 laboratories, animal holding rooms, office spaces, large conference room, and shared collaboration space.

Read More

Kiowa County Hospital District, Weisbrod Hospital

Iconergy was selected to perform a turnkey retrofit of the Weisbrod Hospital via a Performance Contract. Phase One of the project is a $1.5M MEP and controls retrofit project that will address thermal comfort, control ability, and egress issues while also finding utility savings via lighting, mechanical, and roofing/envelope systems.

Iconergy was selected to perform a turnkey retrofit of the Weisbrod Hospital via a Performance Contract. Phase One of the project is a $1.5M MEP and controls retrofit project that will address thermal comfort, control ability, and egress issues while also finding utility savings via lighting, mechanical, and roofing/envelope systems.

Read More

Thermo Fisher Scientific

Retro-commissioning services were performed for the Thermo Fisher laboratory and identified energy conservation measures (ECMs), principally around their cryogenic freezers and laboratory HVAC/controls systems. Iconergy leveraged Xcel Energy rebates and incentives which lowered the simple payback for the suite of measure to only 1.4 years.

Retro-commissioning services were performed for the Thermo Fisher laboratory and identified energy conservation measures (ECMs), principally around their cryogenic freezers and laboratory HVAC/controls systems. Iconergy leveraged Xcel Energy rebates and incentives which lowered the simple payback for the suite of measure to only 1.4 years.

Read More

University of Wyoming, Energy and Engineering Research Building

Fundamental and Enhanced Commissioning services were performed for this newly constructed 100,100 square foot teaching and research laboratory. The four-story facility will include reconfigurable research laboratories, active-learning classrooms, an active-learning wet laboratory, a drilling and completions simulation laboratory, an advanced manufacturing laboratory, student project spaces, a student innovation center, a student entrepreneurship center, informal collaboration spaces, and meeting rooms. This project anticipates earning certification under LEED BD+C: New Construction - v3 LEED 2009.

Fundamental and Enhanced Commissioning services were performed for this newly constructed 100,100 square foot teaching and research laboratory. The four-story facility will include reconfigurable research laboratories, active-learning classrooms, an active-learning wet laboratory, a drilling and completions simulation laboratory, an advanced manufacturing laboratory, student project spaces, a student innovation center, a student entrepreneurship center, informal collaboration…

Read More

University of Wyoming, Science Initiative

The new Science Initiative facility is planned to be a five‐story, 147,000 square foot research facility comprised of laboratories, a vivarium, a rooftop greenhouse, a 200‐seat active‐learning classroom, and student collaboration areas. Our team performed commissioning services for the building.

The new Science Initiative facility is planned to be a five‐story, 147,000 square foot research facility comprised of laboratories, a vivarium, a rooftop greenhouse, a 200‐seat active‐learning classroom, and student collaboration areas. Our team performed commissioning services for the building.

Read More

University of Wyoming, Michael B. Enzi STEM Building

Iconergy provided commissioning services for the three-story Michael B. Enzi STEM Building. The facility is 107,000 square feet and comprised of laboratories, classrooms, and offices to support the chemistry, life sciences, and physics and astronomy departments.

Iconergy provided commissioning services for the three-story Michael B. Enzi STEM Building. The facility is 107,000 square feet and comprised of laboratories, classrooms, and offices to support the chemistry, life sciences, and physics and astronomy departments.

Read More