Iconergy completed a Water Metering Performance Contract for the Town of Center to provide an Advanced Metering Infrastructure (AMI) water meter system for the town’s 850 water taps that were previously unmetered. Iconergy supported applications of grants and low interest loans that when combined with the revenue capture from the new meters via a performance contract. This is one of the first AMI performance contracting projects in the State of Colorado.

Town of Center

Iconergy completed a Water Metering Performance Contract for the Town of Center to provide an Advanced Metering Infrastructure (AMI) water meter system for the town’s 850 water taps that were previously not metered. Iconergy supported applications of grants and low interest loans that when combined with the revenue capture from the new meters via a performance contract. This is one …

Iconergy provided Energy Modeling for the museum. As part of the schematic design process, building energy simulation modeling was utilized to provide a comparative analysis of several design options. Subsequently, we provided commissioning services to this 60,000 SF facility dedicated to sustainability. The US Olympic Museum is pursuing LEED certification and Iconergy is helping them achieve that goal with commissioned systems that include HVAC, lighting, and domestic hot water.

U.S. Olympic & Paralympic Museum

The United States Olympic and Paralympic Museum is truly a world class venue, which does a beautiful job of highlighting our athletes, as well as embodying the environmental stewardship Colorado is known for. Iconergy lead LEED energy modeling and commissioning for the 60,000 square foot museum. The museum is comprised of multiple exhibit halls, a multimedia theater, events space, administration …

Commissioning services were performed for this 45,000 square foot justice center. The facility was comprised of three courtrooms, two hearing rooms, and a room that is multipurpose and was funded by the implementation of a county sales tax.

Alamosa County Justice Center

Commissioning services were performed for this 45,000 square foot justice center. The facility was comprised of three courtrooms, two hearing rooms, and a room that is multipurpose and was funded by the implementation of a county sales tax.

Commissioning, energy design, and energy modeling services were performed for the 31,000 square foot library renovation and 4,500 square foot expansion. The existing portion of the Library was a historic renovation and the expansion included a children’s reading area with a heated radiant floor.

Pitkin County Library

Commissioning, energy design, and energy modeling services were performed for the 31,000 square foot library renovation and 4,500 square foot expansion. The existing portion of the Library was a historic renovation and the expansion included a children’s reading area with a heated radiant floor.

Iconergy partnered with Clear Creek County to develop and utilize an energy performance contract to optimize the performance of all of the County's facilities. Total estimated annual savings are roughly 36% of the baseline electric consumption, 16% of the baseline electric demand, and 25% of the baseline natural gas use. The total verified annual savings are over-performign the County's EPC guarantee, and are appraoching $70,000 a year, or more than 20% of the baseline facility utility costs.

Clear Creek County – Countywide Retrofits

Iconergy partnered with Clear Creek County to develop and utilize an energy performance contract to optimize the performance of all of the County’s facilities. Total estimated annual savings are roughly 36% of the baseline electric consumption, 16% of the baseline electric demand, and 25% of the baseline natural gas use. The total verified annual savings are over-performign the County’s EPC …

Iconergy implemented energy conservation measures for the Wray Rehabilitation and Activities Center. The facility houses a recreation center, occupational therapy center, and rural community center.

Wray Rehabilitation and Activities Center

Iconergy implemented energy conservation measures for the Wray Rehabilitation and Activities Center. The facility houses a recreation center, occupational therapy center, and rural community center.

Clear Creek County secured design-build retrofit and construction services from Iconergy as part of its Courtroom Remodel project. The project included a complete renovation and reconfiguration of the courtrooms, judge's chambers, and various support office spaces so they could meet ADA and new programming requirements for how the courthouse was to operate.

Clear Creek County Courthouse Complex

Clear Creek County secured design-build retrofit and construction services from Iconergy as part of its Courtroom Remodel project. The project included a complete renovation and reconfiguration of the courtrooms, judge’s chambers, and various support office spaces so they could meet ADA and new programming requirements for how the courthouse was to operate.

Iconergy installed a building automation system (BAS) at the Colorado Talking Book Library and incorporated additional energy saving and comfort improving features via the BAS that addressed long-standing client concerns.

Colorado Talking Book Library

Iconergy installed a building automation system (BAS) at the Colorado Talking Book Library and incorporated additional energy saving and comfort improving features via the BAS that addressed long-standing client concerns.

LEED Fundamental and Enhanced Commissioning, measurement and verification, and thermal comfort verification services were performed for the 694,859 square foot state courthouse. Additionally, our team performed monitoring-based commissioning using SkySpark. The Judicial Center encompasses the Colorado Supreme Court, the Colorado Court of Appeals, and numerous judicial and legal agencies. This project achieved LEED BD+C: New Construction v3 - LEED 2009 Gold certification.

Ralph L. Carr Colorado Judicial Center

LEED Fundamental and Enhanced Commissioning, measurement and verification, and thermal comfort verification services were performed for the 694,859 square foot state courthouse. Additionally, our team performed monitoring-based commissioning using SkySpark. The Judicial Center encompasses the Colorado Supreme Court, the Colorado Court of Appeals, and numerous judicial and legal agencies. This project achieved LEED BD+C: New Construction v3 – LEED 2009 …