An Energy Performance Contract was performed for the 94,982 square foot PK-12 school and adjacent vocational – agricultural building. Iconergy guided the grant applications and technical presentations for funding these facilities’ improvements. Energy conservation measures including mechanical systems, roofing, control systems, and lighting have been implemented and Iconergy is currently performing measurement and verification for those implementations.

Haxtun School District RE-2J

An Energy Performance Contract was performed for the 94,982 square foot PK-12 school and adjacent vocational – agricultural building. Iconergy guided the grant applications and technical presentations for funding these facilities’ improvements. Energy conservation measures including mechanical systems, roofing, control systems, and lighting have been implemented and Iconergy is currently performing measurement and verification for those implementations.

Building controls were upgraded for the existing 125,000 square foot laboratory building that supports the Chemistry and the Civil and Environmental Engineering Departments. There was a total of 20 laboratory spaces, all with air valves on the supply air, hood and snorkel air, and exhaust air systems.

Colorado School of Mines, Coolbaugh Hall

Building controls were upgraded for the existing 125,000 square foot laboratory building that supports the Chemistry and the Civil and Environmental Engineering Departments. There was a total of 20 laboratory spaces, all with air valves on the supply air, hood and snorkel air, and exhaust air systems.

Fundamental and Enhanced Commissioning services were performed for the 94,217 square foot, newly constructed building, which houses the Department of Physics and supports the College of Applied Science and Engineering. This project achieved LEED BD+C: New Construction v3 - LEED 2009 Silver certification.

Colorado School of Mines, CoorsTek Center for Applied Science and Engineering

Fundamental and Enhanced Commissioning services were performed for the 94,217 square foot, newly constructed building, which houses the Department of Physics and supports the College of Applied Science and Engineering. This project achieved LEED BD+C: New Construction v3 – LEED 2009 Silver certification.

Prowers Medical Center

Iconergy provided forensic MEP investigation at this regional hospital in rural Colorado as part of a turnkey retro-commissioning study to determine which building systems were and were not working according to healthcare and PMC’s own standards. The engineering study led to both a design-build retrofit project and a retro-commissioning implementation project. Together these implementation efforts yielded improved comfort, building operations, …