Since 2018, Iconergy has performed the required engineering services to assess the Environmental Protection Agency (EPA) ENERGY STAR program for nearly 80 Poudre School District-owned facilities. Our staff ensured that each building met the ASHRAE 62.1 acceptable indoor environmental quality standards, documented comprehensive energy use of building equipment (such as classroom computers) and environmental systems and equipment, and answered EPA questions regarding the submitted data.

Poudre School District

Since 2018, Iconergy has performed the required engineering services to assess the Environmental Protection Agency (EPA) ENERGY STAR program for nearly 80 Poudre School District-owned facilities. Our staff ensured that each building met the ASHRAE 62.1 acceptable indoor environmental quality standards, documented comprehensive energy use of building equipment (such as classroom computers) and environmental systems and equipment, and answered EPA …

To meet requirements for the State of Colorado’s High Performance Certification Program, Iconergy proposes to provide commissioning services equal to LEED v4 (Fundamental and Enhanced Cx) or CHPS Verified through the Collaborative for High Performance Schools. As the project design has yet to begin, plans are currently on this 74,250 SF school of medium complexity (VAV rooftop units with heating and chilled water plants, no renewable energy systems). The certification process dictates which equipment must be commissioned. Under a CHPS program the scope must include HVAC mechanical systems/equipment, the domestic hot water heating plant and automated lighting controls. LEED v4 includes the systems required under CHPS, as well as power distribution systems.

Deer Trail 26J School District, Deer Trail PK-12 School

To meet requirements for the State of Colorado’s High Performance Certification Program, Iconergy proposes to provide commissioning services equal to LEED v4 (Fundamental and Enhanced Cx) or CHPS Verified through the Collaborative for High Performance Schools. As the project design has yet to begin, plans are currently on this 74,250 SF school of medium complexity (VAV rooftop units with heating …

An Energy Performance Contract was performed for the 94,982 square foot PK-12 school and adjacent vocational – agricultural building. Iconergy guided the grant applications and technical presentations for funding these facilities’ improvements. Energy conservation measures including mechanical systems, roofing, control systems, and lighting have been implemented and Iconergy is currently performing measurement and verification for those implementations.

Haxtun School District RE-2J

An Energy Performance Contract was performed for the 94,982 square foot PK-12 school and adjacent vocational – agricultural building. Iconergy guided the grant applications and technical presentations for funding these facilities’ improvements. Energy conservation measures including mechanical systems, roofing, control systems, and lighting have been implemented and Iconergy is currently performing measurement and verification for those implementations.

Iconergy completed the District wide LED lighting retrofit including 14 schools and District administration buildings totaling over 840,000 square feet. The project followed an aggressive installation schedule that was to be substantially completed in 14 weeks. Iconergy was successful in obtaining over $280k of grant funds from the local utility and managed all aspects of the pre and post power and energy savings evaluations and the installation verification process with the local utility.

Eagle County School District

Iconergy was the provider for Energy Services delivered through the 2016 – 2018 Eagle County School District Bond program. Iconergy’s role was to provide energy efficiency retrofits to meet the overall sustainability goals set forth by the District for the bond projects. Iconergy completed the District wide LED lighting retrofit including 14 schools and District administration buildings totaling over 840,000 …

Commissioned the newly constructed 90,000 square foot elementary school. Denver Public Schools (DPS) requested Iconergy go beyond LEED requirements by adding plumbing and electrical systems to the commissioning scope, and requested Iconergy provide systems-level training directly to DPS staff.

Denver Public Schools, Isabella Bird Community School

Commissioned the newly constructed 90,000 square foot elementary school. Denver Public Schools (DPS) requested Iconergy go beyond LEED requirements by adding plumbing and electrical systems to the commissioning scope, and requested Iconergy provide systems-level training directly to DPS staff.

Bromley East Charter School

Commissioning services of the 93,526 square feet of existing space and the 34,491 square foot addition was performed for the school serving students in 6th – 12th grade. A retro-commissioning HVAC assessment of the existing equipment was also performed to provide an understanding of the state of operation of existing HVAC equipment prior to integration of the new construction addition.