Commissioning services were performed for this 45,000 square foot justice center. The facility was comprised of three courtrooms, two hearing rooms, and a room that is multipurpose and was funded by the implementation of a county sales tax.

Alamosa County Justice Center

Commissioning services were performed for this 45,000 square foot justice center. The facility was comprised of three courtrooms, two hearing rooms, and a room that is multipurpose and was funded by the implementation of a county sales tax.

Commissioning, energy design, and energy modeling services were performed for the 31,000 square foot library renovation and 4,500 square foot expansion. The existing portion of the Library was a historic renovation and the expansion included a children’s reading area with a heated radiant floor.

Pitkin County Library

Commissioning, energy design, and energy modeling services were performed for the 31,000 square foot library renovation and 4,500 square foot expansion. The existing portion of the Library was a historic renovation and the expansion included a children’s reading area with a heated radiant floor.

Iconergy was contracted by Miller Global Properties to perform commissioning services for the seven-story, 216,811 square foot Dry Creek Center. This Class A office project was initially only a core and shell building; however, the tenant also then contracted with Iconergy to provide core and interior commissioning as well during the tenant fit out. The project earned a LEED BD+C: Core and Shell (v3) Silver certification.

Miller Global Properties, Dry Creek Center

Iconergy was contracted by Miller Global Properties to perform commissioning services for the seven-story, 216,811 square foot Dry Creek Center. This Class A office project was initially only a core and shell building; however, the tenant also then contracted with Iconergy to provide core and interior commissioning as well during the tenant fit out. The project earned a LEED BD+C: …

Commissioning services were performed for this 73,461 square foot, three-story building that houses a theater that includes two green rooms, lobbies, reception area, and conference rooms. This historic building renovation and addition project, was constructed through a phasing plan in order to continue occupancy during construction. The project achieved LEED BD+C: New Construction v3 - LEED 2009 Silver certification.

Adams State University, Richardson Hall

Commissioning services were performed for this 73,461 square foot, three-story building that houses a theater that includes two green rooms, lobbies, reception area, and conference rooms. This historic building renovation and addition project, was constructed through a phasing plan in order to continue occupancy during construction. The project achieved LEED BD+C: New Construction v3 – LEED 2009 Silver certification.

Iconergy provided commissioning services for the mechanical system retrofit project of the University’s main biology laboratory building. The 160,000 square foot facility houses laboratories, offices, classrooms, storage rooms, and a 25-room vivarium. The building was deemed one of the University’s best-performing laboratories, boasting an energy intensity of 80-90 kBTU/SF/year.

University of Wyoming, Biological Science Building

Iconergy provided commissioning services for the mechanical system retrofit project of the University’s main biology laboratory building. The 160,000 square foot facility houses laboratories, offices, classrooms, storage rooms, and a 25-room vivarium. The building was deemed one of the University’s best-performing laboratories, boasting an energy intensity of 80-90 kBTU/SF/year

Iconergy provided commissioning services for the three-story Michael B. Enzi STEM Building. The facility is 107,000 square feet and comprised of laboratories, classrooms, and offices to support the chemistry, life sciences, and physics and astronomy departments.

University of Wyoming, Michael B. Enzi STEM Building

Iconergy provided commissioning services for the three-story Michael B. Enzi STEM Building. The facility is 107,000 square feet and comprised of laboratories, classrooms, and offices to support the chemistry, life sciences, and physics and astronomy departments.

Iconergy provided Fundamental and Enhanced Commissioning services for the 90,000 square foot research laboratory that supports the Center of Innovation for Flow Through Porous Media, improved oil recovery, Geomechanics and structural engineering.

University of Wyoming High Bay Research Facility

Iconergy provided Fundamental and Enhanced Commissioning services for the 90,000 square foot research laboratory that supports the Center of Innovation for Flow Through Porous Media, improved oil recovery, Geomechanics and structural engineering.

Iconergy commissioned the 58,000 square foot medical office building addition to an existing 143,000 square foot hospital. The two-story medical office building houses specialty physicians and ambulatory services.

Sauk Prairie Healthcare, Medical Office Building

Iconergy commissioned the 58,000 square foot medical office building addition to an existing 143,000 square foot hospital. The two-story medical office building houses specialty physicians and ambulatory services.

Over the past four years, Iconergy has completed commissioning, retrocommissioning, and monitoring-based commissioning at various facilities through Fort Collins. The Fort Collins EPIC Center, Mulberry Pool, Lincoln Center, and Museum of Discovery are some of the buildings we have completed work for.

City of Fort Collins

Over the past four years, Iconergy has completed commissioning, retrocommissioning, and monitoring-based commissioning at various facilities through Fort Collins. The Fort Collins EPIC Center, Mulberry Pool, Lincoln Center, and Museum of Discovery are some of the buildings we have completed work for.

Commissioning  services were performed for the museum's de-humidification system's design and installation. Iconergy's subsequent monitoring-based commissioning services for the whole building enabled the museum to meet changing thermal comfort and operational needs associated with rotating exhibits as well as unlocking additional energy savings for this LEED Platinum building.

City of Fort Collins: Museum of Discovery

Commissioning  services were performed for the museum’s de-humidification system’s design and installation. Iconergy’s subsequent monitoring-based commissioning services for the whole building enabled the museum to meet changing thermal comfort and operational needs associated with rotating exhibits as well as unlocking additional energy savings for this LEED Platinum building.