Iconergy partnered with Clear Creek County to develop and utilize an energy performance contract to optimize the performance of all of the County’s facilities. Total estimated annual savings are roughly 36% of the baseline electric consumption, 16% of the baseline electric demand, and 25% of the baseline natural gas use. The total verified annual savings are over-performign the County’s EPC …
Focus Points Family Resource Center
Iconergy provided energy efficiency upgrades for the 26,000 square foot facility that was estimated to achieve more than $50,000 in annual energy savings. The Focus Points Family Resource Center is non-profit that provides free to low-cost youth and adult educational services for the community.
Wray Rehabilitation and Activities Center
Iconergy implemented energy conservation measures for the Wray Rehabilitation and Activities Center. The facility houses a recreation center, occupational therapy center, and rural community center.
Clear Creek County Courthouse Complex
Clear Creek County secured design-build retrofit and construction services from Iconergy as part of its Courtroom Remodel project. The project included a complete renovation and reconfiguration of the courtrooms, judge’s chambers, and various support office spaces so they could meet ADA and new programming requirements for how the courthouse was to operate.
Colorado Talking Book Library
Iconergy installed a building automation system (BAS) at the Colorado Talking Book Library and incorporated additional energy saving and comfort improving features via the BAS that addressed long-standing client concerns.
Empowerment on Lowry
Iconergy’s design-build scope of work included new appliances, low flow water fixtures, boilers retrocommissioning, new programmable thermostats, lighting upgrades, and all new windows.
Empowerment on Logan
Iconergy’s design-build retrofit scope of work for this character-filled apartment property included the following: New LED lighting inside and out, low flow water fixtures, and weatherization.
Colorado School of Mines, Coolbaugh Hall
Building controls were upgraded for the existing 125,000 square foot laboratory building that supports the Chemistry and the Civil and Environmental Engineering Departments. There was a total of 20 laboratory spaces, all with air valves on the supply air, hood and snorkel air, and exhaust air systems.
Prowers Medical Center
Iconergy provided forensic MEP investigation at this regional hospital in rural Colorado as part of a turnkey retro-commissioning study to determine which building systems were and were not working according to healthcare and PMC’s own standards. The engineering study led to both a design-build retrofit project and a retro-commissioning implementation project. Together these implementation efforts yielded improved comfort, building operations, …
Jefferson County Public Schools, Arvada West High School
Retro-Commissioning services were performed to investigate the central heating and cooling plant operation as well as rooftop unit operation at the high school. Iconergy staff identified five opportunities that were calculated to reduce annual energy demand by 457,708 kWh. Iconergy also performed commissioning on this project upon its completion.