To meet requirements for the State of Colorado’s High Performance Certification Program, Iconergy proposes to provide commissioning services equal to LEED v4 (Fundamental and Enhanced Cx) or CHPS Verified through the Collaborative for High Performance Schools. As the project design has yet to begin, plans are currently on this 74,250 SF school of medium complexity (VAV rooftop units with heating and chilled water plants, no renewable energy systems). The certification process dictates which equipment must be commissioned. Under a CHPS program the scope must include HVAC mechanical systems/equipment, the domestic hot water heating plant and automated lighting controls. LEED v4 includes the systems required under CHPS, as well as power distribution systems.

Deer Trail 26J School District, Deer Trail PK-12 School

To meet requirements for the State of Colorado’s High Performance Certification Program, Iconergy proposes to provide commissioning services equal to LEED v4 (Fundamental and Enhanced Cx) or CHPS Verified through the Collaborative for High Performance Schools. As the project design has yet to begin, plans are currently on this 74,250 SF school of medium complexity (VAV rooftop units with heating …

Iconergy provided Energy Modeling for the museum. As part of the schematic design process, building energy simulation modeling was utilized to provide a comparative analysis of several design options. Subsequently, we provided commissioning services to this 60,000 SF facility dedicated to sustainability. The US Olympic Museum is pursuing LEED certification and Iconergy is helping them achieve that goal with commissioned systems that include HVAC, lighting, and domestic hot water.

U.S. Olympic & Paralympic Museum

The United States Olympic and Paralympic Museum is truly a world class venue, which does a beautiful job of highlighting our athletes, as well as embodying the environmental stewardship Colorado is known for. Iconergy lead LEED energy modeling and commissioning for the 60,000 square foot museum. The museum is comprised of multiple exhibit halls, a multimedia theater, events space, administration …

Commissioning, energy design, and energy modeling services were performed for the 31,000 square foot library renovation and 4,500 square foot expansion. The existing portion of the Library was a historic renovation and the expansion included a children’s reading area with a heated radiant floor.

Pitkin County Library

Commissioning, energy design, and energy modeling services were performed for the 31,000 square foot library renovation and 4,500 square foot expansion. The existing portion of the Library was a historic renovation and the expansion included a children’s reading area with a heated radiant floor.

Commissioning services were performed for this 73,461 square foot, three-story building that houses a theater that includes two green rooms, lobbies, reception area, and conference rooms. This historic building renovation and addition project, was constructed through a phasing plan in order to continue occupancy during construction. The project achieved LEED BD+C: New Construction v3 - LEED 2009 Silver certification.

Adams State University, Richardson Hall

Commissioning services were performed for this 73,461 square foot, three-story building that houses a theater that includes two green rooms, lobbies, reception area, and conference rooms. This historic building renovation and addition project, was constructed through a phasing plan in order to continue occupancy during construction. The project achieved LEED BD+C: New Construction v3 – LEED 2009 Silver certification.