Iconergy is performing an efficiency retrofit under an energy performance contract for the State of Colorado’s capitol building and more than a dozen affiliated state agency facilities managed by the Colorado Department of Personnel and Administration. In total, there are 18 buildings that comprise over 1,811,866 square feet.

Colorado Department of Personnel and Administration

Iconergy is performing an efficiency retrofit under an energy performance contract for the State of Colorado’s capitol building and more than a dozen affiliated state agency facilities managed by the Colorado Department of Personnel and Administration. In total, there are 18 buildings that comprise over 1,811,866 square feet. Phase I of this project was to retrofit all the buildings’ lighting …

An Energy Performance Contract was performed for the 94,982 square foot PK-12 school and adjacent vocational – agricultural building. Iconergy guided the grant applications and technical presentations for funding these facilities’ improvements. Energy conservation measures including mechanical systems, roofing, control systems, and lighting have been implemented and Iconergy is currently performing measurement and verification for those implementations.

Haxtun School District RE-2J

An Energy Performance Contract was performed for the 94,982 square foot PK-12 school and adjacent vocational – agricultural building. Iconergy guided the grant applications and technical presentations for funding these facilities’ improvements. Energy conservation measures including mechanical systems, roofing, control systems, and lighting have been implemented and Iconergy is currently performing measurement and verification for those implementations.

Iconergy partnered with Clear Creek County to develop and utilize an energy performance contract to optimize the performance of all of the County's facilities. Total estimated annual savings are roughly 36% of the baseline electric consumption, 16% of the baseline electric demand, and 25% of the baseline natural gas use. The total verified annual savings are over-performign the County's EPC guarantee, and are appraoching $70,000 a year, or more than 20% of the baseline facility utility costs.

Clear Creek County – Countywide Retrofits

Iconergy partnered with Clear Creek County to develop and utilize an energy performance contract to optimize the performance of all of the County’s facilities. Total estimated annual savings are roughly 36% of the baseline electric consumption, 16% of the baseline electric demand, and 25% of the baseline natural gas use. The total verified annual savings are over-performign the County’s EPC …

Iconergy executed an Energy Performance Contract for Clear Creek County that covered 18 buildings and nearly 1,000,000 SF of space. The $2.63M project secured funding through cash/lease-purchase. The list of improvements at county facilities include: lighting optimization, plug loads and appliances, air-side HVAC, HVAC controls, domestic hot water heaters, building envelope, and solar photovoltaic.

Clear Creek County

Iconergy executed an Energy Performance Contract for Clear Creek County that covered 18 buildings and nearly 1,000,000 SF of space. The $2.63M project secured funding through cash/lease-purchase. The list of improvements at county facilities include: lighting optimization, plug loads and appliances, air-side HVAC, HVAC controls, domestic hot water heaters, building envelope, and solar photovoltaic.