Iconergy provided commissioning services for the mechanical system retrofit project of the University’s main biology laboratory building. The 160,000 square foot facility houses laboratories, offices, classrooms, storage rooms, and a 25-room vivarium. The building was deemed one of the University’s best-performing laboratories, boasting an energy intensity of 80-90 kBTU/SF/year.

University of Wyoming, Biological Science Building

Iconergy provided commissioning services for the mechanical system retrofit project of the University’s main biology laboratory building. The 160,000 square foot facility houses laboratories, offices, classrooms, storage rooms, and a 25-room vivarium. The building was deemed one of the University’s best-performing laboratories, boasting an energy intensity of 80-90 kBTU/SF/year

Commissioning  services were performed for the museum's de-humidification system's design and installation. Iconergy's subsequent monitoring-based commissioning services for the whole building enabled the museum to meet changing thermal comfort and operational needs associated with rotating exhibits as well as unlocking additional energy savings for this LEED Platinum building.

City of Fort Collins: Museum of Discovery

Commissioning  services were performed for the museum’s de-humidification system’s design and installation. Iconergy’s subsequent monitoring-based commissioning services for the whole building enabled the museum to meet changing thermal comfort and operational needs associated with rotating exhibits as well as unlocking additional energy savings for this LEED Platinum building.

LEED Fundamental and Enhanced Commissioning, measurement and verification, and thermal comfort verification services were performed for the 694,859 square foot state courthouse. Additionally, our team performed monitoring-based commissioning using SkySpark. The Judicial Center encompasses the Colorado Supreme Court, the Colorado Court of Appeals, and numerous judicial and legal agencies. This project achieved LEED BD+C: New Construction v3 - LEED 2009 Gold certification.

Ralph L. Carr Colorado Judicial Center

LEED Fundamental and Enhanced Commissioning, measurement and verification, and thermal comfort verification services were performed for the 694,859 square foot state courthouse. Additionally, our team performed monitoring-based commissioning using SkySpark. The Judicial Center encompasses the Colorado Supreme Court, the Colorado Court of Appeals, and numerous judicial and legal agencies. This project achieved LEED BD+C: New Construction v3 – LEED 2009 …

Iconergy commissioned this 105,765 square-foot facility, which houses student support, theatre, and a visitor center. This project achieved LEED BD+C: New Construction v3 - LEED 2009 Gold certification.

AHEC Tivoli Theater

Iconergy commissioned this 105,765 square-foot facility, which houses student support, theatre, and a visitor center. This project achieved LEED BD+C: New Construction v3 – LEED 2009 Gold certification.

The Canvas Stadium is home to the CSU Rams football team and also serves as highly active facility for many events and academic classes. Iconergy provided Fundamental Commissioning for the 727,000 square foot stadium, featuring locker rooms, training facilities, rehabilitation services, offices, concessions, suites, restaurants, conference rooms, hall of champions and academic lecture halls.

Colorado State University, Canvas Stadium

The Canvas Stadium is home to the CSU Rams football team and also serves as highly active facility for many events and academic classes. Iconergy provided Fundamental Commissioning for the 727,000 square foot stadium, featuring locker rooms, training facilities, rehabilitation services, offices, concessions, suites, restaurants, conference rooms, hall of champions and academic lecture halls.

Fundamental and Enhanced Commissioning services were performed for the 94,217 square foot, newly constructed building, which houses the Department of Physics and supports the College of Applied Science and Engineering. This project achieved LEED BD+C: New Construction v3 - LEED 2009 Silver certification.

Colorado School of Mines, CoorsTek Center for Applied Science and Engineering

Fundamental and Enhanced Commissioning services were performed for the 94,217 square foot, newly constructed building, which houses the Department of Physics and supports the College of Applied Science and Engineering. This project achieved LEED BD+C: New Construction v3 – LEED 2009 Silver certification.

Commissioned the newly constructed 90,000 square foot elementary school. Denver Public Schools (DPS) requested Iconergy go beyond LEED requirements by adding plumbing and electrical systems to the commissioning scope, and requested Iconergy provide systems-level training directly to DPS staff.

Denver Public Schools, Isabella Bird Community School

Commissioned the newly constructed 90,000 square foot elementary school. Denver Public Schools (DPS) requested Iconergy go beyond LEED requirements by adding plumbing and electrical systems to the commissioning scope, and requested Iconergy provide systems-level training directly to DPS staff.

Retro-Commissioning services were performed to investigate the central heating and cooling plant operation as well as rooftop unit operation at the high school. Iconergy staff identified five opportunities that were calculated to reduce annual energy demand by 457,708 kWh. Iconergy also performed commissioning on this project upon its completion.

Jefferson County Public Schools, Arvada West High School

Retro-Commissioning services were performed to investigate the central heating and cooling plant operation as well as rooftop unit operation at the high school. Iconergy staff identified five opportunities that were calculated to reduce annual energy demand by 457,708 kWh. Iconergy also performed commissioning on this project upon its completion.