Iconergy partnered with Clear Creek County to develop and utilize an energy performance contract to optimize the performance of all of the County's facilities. Total estimated annual savings are roughly 36% of the baseline electric consumption, 16% of the baseline electric demand, and 25% of the baseline natural gas use. The total verified annual savings are over-performign the County's EPC guarantee, and are appraoching $70,000 a year, or more than 20% of the baseline facility utility costs.

Clear Creek County – Countywide Retrofits

Iconergy partnered with Clear Creek County to develop and utilize an energy performance contract to optimize the performance of all of the County’s facilities. Total estimated annual savings are roughly 36% of the baseline electric consumption, 16% of the baseline electric demand, and 25% of the baseline natural gas use. The total verified annual savings are over-performign the County’s EPC …

A Technical Energy Audit was performed for the 55,000 square foot recreation facility. An Energy Performance Contract was then executed to implement energy conservation measures, which achieved the 30% savings guarantee.

Cheyenne Family YMCA

A Technical Energy Audit was performed for the 55,000 square foot recreation facility. An Energy Performance Contract was then executed to implement energy conservation measures, which achieved the 30% savings guarantee.

Performed a turnkey design-build retrofit for this 8-building complex. Iconergy developed and executed a scope of work via an Investment Grade Audit and subsequent Performance Contract. Many energy conservation measures (ECMs) were implemented such as retrofitting exterior and parking garage lighting, insulation, and replacing boilers. Phase 1 over-performed guaranteed savings by more than 10%.

Breckenridge Grand Vacations

Performed a turnkey design-build retrofit for this 8-building complex. Iconergy developed and executed a scope of work via an Investment Grade Audit and subsequent Performance Contract. Many energy conservation measures (ECMs) were implemented such as retrofitting exterior and parking garage lighting, insulation, and replacing boilers. Phase 1 over-performed guaranteed savings by more than 10%.