Since 2014, the Colorado Department of Public Health and Environment (CDPHE) has contracted Iconergy to perform various building energy engineering services for more than 20 projects for their office and laboratory spaces. Services Iconergy staff have performed include energy and water audits, lighting assessments, renewable energy assessments, commissioning, retro-commissioning, monitored-based commissioning with SkySpark to verify energy savings, and consulting. Many of these projects were completed simultaneously by Iconergy staff in order to meet the desires of CDPHE and complete projects within the contracted timeline.

Colorado Department of Public Health and Environment

Since 2014, the Colorado Department of Public Health and Environment (CDPHE) has contracted Iconergy to perform various building energy engineering services for more than 20 projects for their office and laboratory spaces. Services Iconergy staff have performed include energy and water audits, lighting assessments, renewable energy assessments, commissioning, retro-commissioning, monitored-based commissioning with SkySpark to verify energy savings, and consulting. Many …

To meet requirements for the State of Colorado’s High Performance Certification Program, Iconergy proposes to provide commissioning services equal to LEED v4 (Fundamental and Enhanced Cx) or CHPS Verified through the Collaborative for High Performance Schools. As the project design has yet to begin, plans are currently on this 74,250 SF school of medium complexity (VAV rooftop units with heating and chilled water plants, no renewable energy systems). The certification process dictates which equipment must be commissioned. Under a CHPS program the scope must include HVAC mechanical systems/equipment, the domestic hot water heating plant and automated lighting controls. LEED v4 includes the systems required under CHPS, as well as power distribution systems.

Deer Trail 26J School District, Deer Trail PK-12 School

To meet requirements for the State of Colorado’s High Performance Certification Program, Iconergy proposes to provide commissioning services equal to LEED v4 (Fundamental and Enhanced Cx) or CHPS Verified through the Collaborative for High Performance Schools. As the project design has yet to begin, plans are currently on this 74,250 SF school of medium complexity (VAV rooftop units with heating …

Iconergy performed retro-commissioning for this large, multi-facility 1.2M square foot office building campus in Chicago. This site has multiple large central water-cooled chiller plants, multiple campus boiler plants, and dozens of air handling units that are a mix of dual duct and single duct VAV systems. Iconergy identified numerous ECMs with a total potential energy savings of over 1,000,000 kilowatt-hours (kWh) per year of electricityand over 100,000 therms per year of natural gas. The total energy cost savings from these ECMs are estimated at approximately $100,000 per year and have an overall project simple payback of 0.5 years.

Large Corporate Client

Iconergy performed retro-commissioning for this large, multi-facility 1.2M square foot office building campus in Chicago. This site has multiple large central water-cooled chiller plants, multiple campus boiler plants, and dozens of air handling units that are a mix of dual duct and single duct VAV systems. Iconergy identified numerous energy conservation measures with a total potential energy savings of over …

Iconergy performed a combination Technical Energy Audit (TEA) and Retro-commissioning assessment for Graebel in Denver, Colorado, which included a one year performance period where they found energy savings through reduction in heating/cooling/humidification loads, increased economizer operations, and a reduction in run-time hours of their 412,340 sqft of office and conditioned warehouse facility space.

Graebel Companies, Inc.

A Technical Energy Audit (TEA) and retro-commissioning services were provided, which included a one year performance period where they found energy savings through reduction in heating/cooling/humidification loads, increased economizer operations, and a reduction in run-time hours of their 412,340 square feet of office and conditioned warehouse facility space.

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Mulberry Pool. The 25,000 square foot facility houses an indoor pool and spa, locker rooms, and community recreation spaces.

City of Fort Collins, Mulberry Pool

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Mulberry Pool. The 25,000 square foot facility houses an indoor pool and spa, locker rooms, and community recreation spaces.

Over the past four years, Iconergy has completed commissioning, retrocommissioning, and monitoring-based commissioning at various facilities through Fort Collins. The Fort Collins EPIC Center, Mulberry Pool, Lincoln Center, and Museum of Discovery are some of the buildings we have completed work for.

City of Fort Collins

Over the past four years, Iconergy has completed commissioning, retrocommissioning, and monitoring-based commissioning at various facilities through Fort Collins. The Fort Collins EPIC Center, Mulberry Pool, Lincoln Center, and Museum of Discovery are some of the buildings we have completed work for.

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for The Lincoln Center. The facility was a 74,143 square foot entertainment facility that houses auditoriums, ballrooms, and offices for the City of Fort Collins. Iconergy staff identified an annual electrical energy savings of 96,661 kWh, 11,200 Therms/year of annual energy savings totaling to $10,213 in savings with a half year payback.

City of Fort Collins, The Lincoln Center

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for The Lincoln Center. The facility was a 74,143 square foot entertainment facility that houses auditoriums, ballrooms, and offices for the City of Fort Collins. Iconergy staff identified an annual electrical energy savings of 96,661 kWh, 11,200 Therms/year of annual energy …

Commissioned mechanical and controls equipment was performed for the 24,000 square foot renovation of the highbay/lowbay facility as well as a reclassification from a 10,000 square foot to a 100,000 square foot clean room.

Lockheed Martin Space Systems

Commissioned mechanical and controls equipment was performed for the 24,000 square foot renovation of the highbay/lowbay facility as well as a reclassification from a 10,000 square foot to a 100,000 square foot clean room.

Auraria Higher Education Center, Science Building

Retro-commissioning services were performed for the 116,000 existing science building and commissioning services were performed for the 197,227 square feet of new construction. The science buildings house teaching and research spaces for biology, anthropology, chemistry, earth sciences, and math and computer sciences. The renovation project achieved LEED BD+C: New Construction v2 – LEED 2.2 Gold certification and the new building …

Prowers Medical Center

Iconergy provided forensic MEP investigation at this regional hospital in rural Colorado as part of a turnkey retro-commissioning study to determine which building systems were and were not working according to healthcare and PMC’s own standards. The engineering study led to both a design-build retrofit project and a retro-commissioning implementation project. Together these implementation efforts yielded improved comfort, building operations, …