Retro-commissioning services were performed for the Thermo Fisher laboratory and identified energy conservation measures (ECMs), principally around their cryogenic freezers and laboratory HVAC/controls systems. Iconergy leveraged Xcel Energy rebates and incentives which lowered the simple payback for the suite of measure to only 1.4 years.

Thermo Fisher Scientific

Retro-commissioning services were performed for the Thermo Fisher laboratory and identified energy conservation measures (ECMs), principally around their cryogenic freezers and laboratory HVAC/controls systems. Iconergy leveraged Xcel Energy rebates and incentives which lowered the simple payback for the suite of measure to only 1.4 years.

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Mulberry Pool. The 25,000 square foot facility houses an indoor pool and spa, locker rooms, and community recreation spaces.

City of Fort Collins, Mulberry Pool

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Mulberry Pool. The 25,000 square foot facility houses an indoor pool and spa, locker rooms, and community recreation spaces.

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Edora Pool & Ice Center (EPIC). The 97,700 square foot recreation center houses an indoor pool, two full size ice rinks, locker rooms, and community recreation spaces.

City of Fort Collins, Edora Pool & Ice Center (EPIC)

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Edora Pool & Ice Center (EPIC). The 97,700 square foot recreation center houses an indoor pool, two full size ice rinks, locker rooms, and community recreation spaces.

Over the past four years, Iconergy has completed commissioning, retrocommissioning, and monitoring-based commissioning at various facilities through Fort Collins. The Fort Collins EPIC Center, Mulberry Pool, Lincoln Center, and Museum of Discovery are some of the buildings we have completed work for.

City of Fort Collins

Over the past four years, Iconergy has completed commissioning, retrocommissioning, and monitoring-based commissioning at various facilities through Fort Collins. The Fort Collins EPIC Center, Mulberry Pool, Lincoln Center, and Museum of Discovery are some of the buildings we have completed work for.

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for The Lincoln Center. The facility was a 74,143 square foot entertainment facility that houses auditoriums, ballrooms, and offices for the City of Fort Collins. Iconergy staff identified an annual electrical energy savings of 96,661 kWh, 11,200 Therms/year of annual energy savings totaling to $10,213 in savings with a half year payback.

City of Fort Collins, The Lincoln Center

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for The Lincoln Center. The facility was a 74,143 square foot entertainment facility that houses auditoriums, ballrooms, and offices for the City of Fort Collins. Iconergy staff identified an annual electrical energy savings of 96,661 kWh, 11,200 Therms/year of annual energy …

Commissioned mechanical and controls equipment was performed for the 24,000 square foot renovation of the highbay/lowbay facility as well as a reclassification from a 10,000 square foot to a 100,000 square foot clean room.

Lockheed Martin Space Systems

Commissioned mechanical and controls equipment was performed for the 24,000 square foot renovation of the highbay/lowbay facility as well as a reclassification from a 10,000 square foot to a 100,000 square foot clean room.

Auraria Higher Education Center, Science Building

Retro-commissioning services were performed for the 116,000 existing science building and commissioning services were performed for the 197,227 square feet of new construction. The science buildings house teaching and research spaces for biology, anthropology, chemistry, earth sciences, and math and computer sciences. The renovation project achieved LEED BD+C: New Construction v2 – LEED 2.2 Gold certification and the new building …

Prowers Medical Center

Iconergy provided forensic MEP investigation at this regional hospital in rural Colorado as part of a turnkey retro-commissioning study to determine which building systems were and were not working according to healthcare and PMC’s own standards. The engineering study led to both a design-build retrofit project and a retro-commissioning implementation project. Together these implementation efforts yielded improved comfort, building operations, …

Bromley East Charter School

Commissioning services of the 93,526 square feet of existing space and the 34,491 square foot addition was performed for the school serving students in 6th – 12th grade. A retro-commissioning HVAC assessment of the existing equipment was also performed to provide an understanding of the state of operation of existing HVAC equipment prior to integration of the new construction addition.

Retro-Commissioning services were performed to investigate the central heating and cooling plant operation as well as rooftop unit operation at the high school. Iconergy staff identified five opportunities that were calculated to reduce annual energy demand by 457,708 kWh. Iconergy also performed commissioning on this project upon its completion.

Jefferson County Public Schools, Arvada West High School

Retro-Commissioning services were performed to investigate the central heating and cooling plant operation as well as rooftop unit operation at the high school. Iconergy staff identified five opportunities that were calculated to reduce annual energy demand by 457,708 kWh. Iconergy also performed commissioning on this project upon its completion.