Colorado Mesa University – Energy Metering

Iconergy was selected to provide Energy Master Planning Services for Colorado Mesa University. The scope included evaluation of campus wide energy efficiency and opportunities for improvements and cost reductions. The campus operates their electric distribution system for the core campus and Iconergy evaluated the opportunities and recommendations for renewables and other utility metering strategies to reduce costs and improve efficiency. Iconergy completed comprehensive benchmarking on their utility data and evaluated rate and purchase options and provided turnkey installation for a campus wide sub metering system that included gas and electric meters. In addition, Iconergy evaluated solar PV opportunities for on building distributed generation and a 2MW off site system connected directly to the utility distribution system and submitted the system for utility approval. One immediate outcome of the Master Plan was to provide sub-metering information for facilities throughout the university’s portfolio. Iconergy designed and installed a sub-metering system that allowed the university to have visibility at both the building level and within buildings (e.g. spaces leased by concessionaires) for the first time, which then allowed for controls optimization.

Iconergy was selected to provide Energy Master Planning Services for Colorado Mesa University. The scope included evaluation of campus wide energy efficiency and opportunities for improvements and cost reductions. The campus operates their electric distribution system for the core campus and Iconergy evaluated the opportunities and recommendations for renewables and other utility metering strategies to…

Read More

Aspen Ski Company, Luxury Hotel

Iconergy optimized this premier property for its guests and occupants. Iconergy performed forensic commissioning and controls services for a hotel and condo property that features a climbing gym, outdoor pool and hot tubs, a restaurant, and a three-level parking garage. Our team was contracted to troubleshoot mechanical and control issues as well as lead the effort for repairing discovered issues. The issues resolved by our team have resulted in increased operating speeds of the building automation system, improved installation to eliminate building automation system errors and faults, and improved quality of instillation and as-builds.

Iconergy optimized this premier property for its guests and occupants. Iconergy performed forensic commissioning and controls services for a hotel and condo property that features a climbing gym, outdoor pool and hot tubs, a restaurant, and a three-level parking garage. Our team was contracted to troubleshoot mechanical and control issues as well as lead the…

Read More

Haxtun School District RE-2J

An Energy Performance Contract was performed for the 94,982 square foot PK-12 school and adjacent vocational – agricultural building. Iconergy guided the grant applications and technical presentations for funding these facilities’ improvements. Energy conservation measures including mechanical systems, roofing, control systems, and lighting have been implemented and Iconergy is currently performing measurement and verification for those implementations.

An Energy Performance Contract was performed for the 94,982 square foot PK-12 school and adjacent vocational – agricultural building. Iconergy guided the grant applications and technical presentations for funding these facilities’ improvements. Energy conservation measures including mechanical systems, roofing, control systems, and lighting have been implemented and Iconergy is currently performing measurement and verification for…

Read More

Clear Creek County – Countywide Retrofits

Iconergy partnered with Clear Creek County to develop and utilize an energy performance contract to optimize the performance of all of the County's facilities. Total estimated annual savings are roughly 36% of the baseline electric consumption, 16% of the baseline electric demand, and 25% of the baseline natural gas use. The total verified annual savings are over-performing the County's EPC guarantee, and are approaching $70,000 a year, or more than 20% of the baseline facility utility costs. Solar photovoltaic panels were analyzed at all Clear Creek County facilities.  The County selected four smaller sites to receive solar panels.  One site was in a historic district and could not be outfitted with solar but the other three sites were, totaling 35kW.

Iconergy partnered with Clear Creek County to develop and utilize an energy performance contract to optimize the performance of all of the County’s facilities. Total estimated annual savings are roughly 36% of the baseline electric consumption, 16% of the baseline electric demand, and 25% of the baseline natural gas use. The total verified annual savings…

Read More

Colorado School of Mines, Coolbaugh Hall

Building controls were upgraded for the existing 125,000 square foot laboratory building that supports the Chemistry and the Civil and Environmental Engineering Departments. There was a total of 20 laboratory spaces, all with air valves on the supply air, hood and snorkel air, and exhaust air systems.

Building controls were upgraded for the existing 125,000 square foot laboratory building that supports the Chemistry and the Civil and Environmental Engineering Departments. There was a total of 20 laboratory spaces, all with air valves on the supply air, hood and snorkel air, and exhaust air systems.

Read More

Prowers Medical Center

Iconergy provided forensic MEP investigation at this regional hospital in rural Colorado as part of a turnkey retro-commissioning study to determine which building systems were and were not working according to healthcare and PMC's own standards. The engineering study led to both a design-build retrofit project and a retro-commissioning implementation project. Together these implementation efforts yielded improved comfort, building operations, and energy savings. PMC was so pleased with Iconergy's work that Iconergy has continued to provide building automation controls support and ongoing commissioning services.

Iconergy provided forensic MEP investigation at this regional hospital in rural Colorado as part of a turnkey retro-commissioning study to determine which building systems were and were not working according to healthcare and PMC’s own standards. The engineering study led to both a design-build retrofit project and a retro-commissioning implementation project. Together these implementation efforts…

Read More