Colorado State University, Center for Vector-Borne Infectious Disease

Translational Medicine Institute (TMI) in Fort Collins, Colorado

Iconergy performed LEED v4 fundamental and enhanced commissioning services for the 38,000 square foot Center for Vector‐Borne & Infectious Disease (CVID) laboratory. The research facility is comprised of BSL‐2 laboratories, animal holding rooms, office spaces, large conference room, and shared collaboration space.

Read More

Swallows Charter Academy

Iconergy provided commissioning services for the Swallows Charter Academy, a BEST grant funded, two-story addition and renovation project for the kindergarten through eighth grade students. The school is comprised of classrooms, a nurse office, conference room, Maker Space art classroom, and state-of-the-art science laboratories.

Iconergy provided commissioning services for the Swallows Charter Academy, a BEST grant funded, two-story addition and renovation project for the kindergarten through eighth grade students. The school is comprised of classrooms, a nurse office, conference room, Maker Space art classroom, and state-of-the-art science laboratories.

Read More

Aspen Ski Comapny, Luxury Hotel

Iconergy performed forensic commissioning and controls services for a hotel and condo property that features a climbing gym, outdoor pool and hot tubs, a restaurant, and a three-level parking garage.

Iconergy partnered with this company to optimize this premier property for its guests and occupants. Iconergy performed forensic commissioning and controls services for a hotel and condo property that features a climbing gym, outdoor pool and hot tubs, a restaurant, and a three-level parking garage. Our team was contracted to troubleshoot mechanical and control issues…

Read More

United States Air Force Academy, Cadet Chapel

Commissioning services are in the process of being performed for the United States Air Force Academy Cadet Chapel renovation project. The facility is 47,960 square feet and received between five hundred thousand and one million cadets, staff, and visitors annually prior to its current renovation. The iconic all-faith place of worship is two-stories and has…

Read More

Colorado Department of Public Health and Environment

Since 2014, the Colorado Department of Public Health and Environment (CDPHE) has contracted Iconergy to perform various building energy engineering services for more than 20 projects for their office and laboratory spaces. Services Iconergy staff have performed include energy and water audits, lighting assessments, renewable energy assessments, commissioning, retro-commissioning, monitored-based commissioning with SkySpark to verify energy savings, and consulting. Many of these projects were completed simultaneously by Iconergy staff in order to meet the desires of CDPHE and complete projects within the contracted timeline.

Since 2014, the Colorado Department of Public Health and Environment (CDPHE) has contracted Iconergy to perform various building energy engineering services for more than 20 projects for their office and laboratory spaces. Services Iconergy staff have performed include energy and water audits, lighting assessments, renewable energy assessments, commissioning, retro-commissioning, monitored-based commissioning with SkySpark to verify…

Read More

Deer Trail 26J School District, Deer Trail PK-12 School

To meet requirements for the State of Colorado’s High Performance Certification Program, Iconergy proposes to provide commissioning services equal to LEED v4 (Fundamental and Enhanced Cx) or CHPS Verified through the Collaborative for High Performance Schools. As the project design has yet to begin, plans are currently on this 74,250 SF school of medium complexity (VAV rooftop units with heating and chilled water plants, no renewable energy systems). The certification process dictates which equipment must be commissioned. Under a CHPS program the scope must include HVAC mechanical systems/equipment, the domestic hot water heating plant and automated lighting controls. LEED v4 includes the systems required under CHPS, as well as power distribution systems.

To meet requirements for the State of Colorado’s High Performance Certification Program, Iconergy proposes to provide commissioning services equal to LEED v4 (Fundamental and Enhanced Cx) or CHPS Verified through the Collaborative for High Performance Schools. As the project design has yet to begin, plans are currently on this 74,250 SF school of medium complexity…

Read More

Wyoming State Capitol Complex

Iconergy provided commissioning services for the Wyoming State Capitol Complex, which is a historical building. This multi-phased project included the 60,000 square foot Capitol Building expansion, the neighboring 229,000 square foot Herschler Building and its 49,000 square foot expansion, and the new 18,000 square foot Central Utility Plant.

Iconergy provided commissioning services for the Wyoming State Capitol Complex, which is a historical building. This multi-phased project included the 60,000 square foot Capitol Building expansion, the neighboring 229,000 square foot Herschler Building and its 49,000 square foot expansion, and the new 18,000 square foot Central Utility Plant.

Read More

City of Fort Collins, Utility Administration Building

Commissioning services were performed for this 37,000 square foot, publicly funded facility, which was the first LEED v4 Platinum certified building in Colorado, and fourth in the entire world.

Commissioning services were performed for this 37,000 square foot, publicly funded facility, which was the first LEED v4 Platinum certified building in Colorado, and fourth in the entire world. The building also earned an ENERGY STAR® score of 100 for operations in 2017 and features a 104-kilowatt solar system. In addition to being one of…

Read More

Eagle County School District

Iconergy completed the District wide LED lighting retrofit including 14 schools and District administration buildings totaling over 840,000 square feet. The project followed an aggressive installation schedule that was to be substantially completed in 14 weeks. Iconergy was successful in obtaining over $280k of grant funds from the local utility and managed all aspects of the pre and post power and energy savings evaluations and the installation verification process with the local utility.

Iconergy was the provider for Energy Services delivered through the 2016 – 2018 Eagle County School District Bond program. Iconergy’s role was to provide energy efficiency retrofits to meet the overall sustainability goals set forth by the District for the bond projects. Iconergy completed the District wide LED lighting retrofit including 14 schools and District…

Read More