Colorado State University, Lory Student Center

“The Center of Life” on campus, the Lory Student Center, is home to a large array of university groups and services. Iconergy performed Fundamental and Enhanced LEED Commissionining for the 160,000 square foot renovation and 40,000 square foot addition for Phase II of this project. This building is LEED BD+C: New Construction v3 - LEED 2009 Silver certified.

“The Center of Life” on campus, the Lory Student Center, is home to a large array of university groups and services. Iconergy performed Fundamental and Enhanced LEED Commissionining for the 160,000 square foot renovation and 40,000 square foot addition for Phase II of this project. This building is LEED BD+C: New Construction v3 – LEED…

Read More

Auraria Higher Education Center, Science Building

Retro-commissioning services were performed for the 116,000 existing science building and commissioning services were performed for the 197,227 square feet of new construction. The science buildings house teaching and research spaces for biology, anthropology, chemistry, earth sciences, and math and computer sciences. The renovation project achieved LEED BD+C: New Construction v2 - LEED 2.2 Gold certification and the new building achieved LEED BD+C: New Construction v2 - LEED 2.2 Gold certification.

Retro-commissioning services were performed for the 116,000 existing science building and commissioning services were performed for the 197,227 square feet of new construction. The science buildings house teaching and research spaces for biology, anthropology, chemistry, earth sciences, and math and computer sciences. The renovation project achieved LEED BD+C: New Construction v2 – LEED 2.2 Gold…

Read More

Colorado State University, C. Wayne McIlwraith Translational Medicine Institute

Fundamental and Enhanced Commissioning services were performed for this 118,026 square foot facility that was enabled by a P3 contract as a long-term facilities strategy to enable the university’s land-grant mission. This building houses the College of Veterinary Medicine and Biomedical Sciences and is comprised of operating rooms, radiology/MRI/CT suites, human research suite, dissection laboratory, freezer farm, teaching laboratory, classrooms, clean room, and a large banquet hall. This facility is anticipated to achieve LEED BD+C: New Construction v3 LEED 2009 Silver certification.

Fundamental and Enhanced Commissioning services were performed for this 118,026 square foot facility that was enabled by a P3 contract as a long-term facilities strategy to enable the university’s land-grant mission. This building houses the College of Veterinary Medicine and Biomedical Sciences and is comprised of operating rooms, radiology/MRI/CT suites, human research suite, dissection laboratory,…

Read More

Colorado State University, Biology Building

Fundamental and Enhanced Commissioning services were performed for this 134,480,000 square foot, newly constructed teaching and research laboratory facility. This project achieved LEED BD+C: New Construction v3 LEED 2009 Gold Certified.

Fundamental and Enhanced Commissioning services were performed for this 134,480,000 square foot, newly constructed teaching and research laboratory facility. This project achieved LEED BD+C: New Construction v3 LEED 2009 Gold Certified.

Read More

Colorado State University, Chemistry Research Building

Fundamental and Enhanced Commissioning services were performed for this 61,000 square foot, newly constructed, state-of-the-art teaching and research laboratory. This project achieved LEED BD+C: New Construction v3 LEED 2009 Platinum certification.

Fundamental and Enhanced Commissioning services were performed for this 61,000 square foot, newly constructed, state-of-the-art teaching and research laboratory. This project achieved LEED BD+C: New Construction v3 LEED 2009 Platinum certification.

Read More

Denver Public Schools, Isabella Bird Community School

Commissioned the newly constructed 90,000 square foot elementary school. Denver Public Schools (DPS) requested Iconergy go beyond LEED requirements by adding plumbing and electrical systems to the commissioning scope, and requested Iconergy provide systems-level training directly to DPS staff.

Commissioned the newly constructed 90,000 square foot elementary school. Denver Public Schools (DPS) requested Iconergy go beyond LEED requirements by adding plumbing and electrical systems to the commissioning scope, and requested Iconergy provide systems-level training directly to DPS staff.

Read More

Thompson School District, High Plains School K-8

Fundamental and Enhanced Commissioning were performed to achieve LEED BD+C: Schools v3 - LEED 2009 Gold certification for this new 63,000 square foot elementary school. The newly constructed two-story K-8 facility featured a geo-exchange system.

Fundamental and Enhanced Commissioning were performed to achieve LEED BD+C: Schools v3 – LEED 2009 Gold certification for this new 63,000 square foot elementary school. The newly constructed two-story K-8 facility featured a geo-exchange system.

Read More