Aspen Ski Comapny, Luxury Hotel

Iconergy performed forensic commissioning and controls services for a hotel and condo property that features a climbing gym, outdoor pool and hot tubs, a restaurant, and a three-level parking garage.

Iconergy partnered with this company to optimize this premier property for its guests and occupants. Iconergy performed forensic commissioning and controls services for a hotel and condo property that features a climbing gym, outdoor pool and hot tubs, a restaurant, and a three-level parking garage. Our team was contracted to troubleshoot mechanical and control issues…

Read More

Colorado Department of Public Health and Environment

Since 2014, the Colorado Department of Public Health and Environment (CDPHE) has contracted Iconergy to perform various building energy engineering services for more than 20 projects for their office and laboratory spaces. Services Iconergy staff have performed include energy and water audits, lighting assessments, renewable energy assessments, commissioning, retro-commissioning, monitored-based commissioning with SkySpark to verify energy savings, and consulting. Many of these projects were completed simultaneously by Iconergy staff in order to meet the desires of CDPHE and complete projects within the contracted timeline.

Since 2014, the Colorado Department of Public Health and Environment (CDPHE) has contracted Iconergy to perform various building energy engineering services for more than 20 projects for their office and laboratory spaces. Services Iconergy staff have performed include energy and water audits, lighting assessments, renewable energy assessments, commissioning, retro-commissioning, monitored-based commissioning with SkySpark to verify…

Read More

Colorado Department of Personnel and Administration

Iconergy is performing an efficiency retrofit under an energy performance contract for the State of Colorado’s capitol building and more than a dozen affiliated state agency facilities managed by the Colorado Department of Personnel and Administration. In total, there are 18 buildings that comprise over 1,811,866 square feet.

Iconergy is performing an efficiency retrofit under an energy performance contract for the State of Colorado’s capitol building and more than a dozen affiliated state agency facilities managed by the Colorado Department of Personnel and Administration. In total, there are 18 buildings that comprise over 1,811,866 square feet. Phase I of this project was to…

Read More

Large Corporate Client

Iconergy performed retro-commissioning for this large, multi-facility 1.2M square foot office building campus in Chicago. This site has multiple large central water-cooled chiller plants, multiple campus boiler plants, and dozens of air handling units that are a mix of dual duct and single duct VAV systems. Iconergy identified numerous ECMs with a total potential energy savings of over 1,000,000 kilowatt-hours (kWh) per year of electricityand over 100,000 therms per year of natural gas. The total energy cost savings from these ECMs are estimated at approximately $100,000 per year and have an overall project simple payback of 0.5 years.

Iconergy performed retro-commissioning for this large, multi-facility 1.2M square foot office building campus in Chicago. This site has multiple large central water-cooled chiller plants, multiple campus boiler plants, and dozens of air handling units that are a mix of dual duct and single duct VAV systems. Iconergy identified numerous energy conservation measures with a total…

Read More

AGC Biologics (AstraZeneca)

Iconergy provided operational and efficiency assistance to MedImmune (AstraZeneca) to improve its Boulder Manufacturing Center. The Iconergy retro-commissioning study encompassed this complex facilities past and future uses. To do that, the RCx Study included past energy studies performed on this facility and both pre-existing and new MEP systems as the site was converted to a new industrial use. Systems evaluated included chillers and pumps, building steam systems, compressed air, domestic hot water, HVAC delivery and equipment, cooling towers, and building automation systems.

Iconergy provided operational and efficiency assistance to MedImmune (AstraZeneca) to improve its Boulder Manufacturing Center. The Iconergy retro-commissioning study encompassed both past energy studies performed on this facility as well as both preexisting and new systems as the site was converted to a new industrial use. Systems evaluated included chillers and pumps, building steam systems,…

Read More

Thermo Fisher Scientific

Retro-commissioning services were performed for the Thermo Fisher laboratory and identified energy conservation measures (ECMs), principally around their cryogenic freezers and laboratory HVAC/controls systems. Iconergy leveraged Xcel Energy rebates and incentives which lowered the simple payback for the suite of measure to only 1.4 years.

Retro-commissioning services were performed for the Thermo Fisher laboratory and identified energy conservation measures (ECMs), principally around their cryogenic freezers and laboratory HVAC/controls systems. Iconergy leveraged Xcel Energy rebates and incentives which lowered the simple payback for the suite of measure to only 1.4 years.

Read More

City of Fort Collins, Mulberry Pool

Mulberry Pool Front

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Mulberry Pool. The 25,000 square foot facilty houses an indoor pool and spa, locker rooms, and community recreation spaces. (new) In 2021, Iconergy completed retro-commissioning services for an HVAC and control system evaluation. The…

Read More

City of Fort Collins, Edora Pool & Ice Center (EPIC)

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Edora Pool & Ice Center (EPIC). The 97,700 square foot recreation center houses an indoor pool, two full size ice rinks, locker rooms, and community recreation spaces.

Iconergy participated in the Platte River Power Authority (PRPA) Building Tune-Up program to provide retro-commissioning and monitoring-based commissioning services for the Edora Pool & Ice Center (EPIC). The 97,700 square foot recreation center houses an indoor pool, two full size ice rinks, locker rooms, and community recreation spaces.

Read More

City of Fort Collins

Over the past four years, Iconergy has completed commissioning, retrocommissioning, and monitoring-based commissioning at various facilities through Fort Collins. The Fort Collins EPIC Center, Mulberry Pool, Lincoln Center, and Museum of Discovery are some of the buildings we have completed work for.

Over the past four years, Iconergy has completed commissioning, retrocommissioning, and monitoring-based commissioning at various facilities through Fort Collins. The Fort Collins EPIC Center, Mulberry Pool, Lincoln Center, and Museum of Discovery are some of the buildings we have completed work for.

Read More

Clear Creek County Courthouse Complex

Clear Creek County secured design-build retrofit and construction services from Iconergy as part of its Courtroom Remodel project. The project included a complete renovation and reconfiguration of the courtrooms, judge's chambers, and various support office spaces so they could meet ADA and new programming requirements for how the courthouse was to operate.

Clear Creek County secured design-build retrofit and construction services from Iconergy as part of its Courtroom Remodel project. The project included a complete renovation and reconfiguration of the courtrooms, judge’s chambers, and various support office spaces so they could meet ADA and new programming requirements for how the courthouse was to operate.

Read More