Empowerment on Lowry

Iconergy's design-build scope of work included new appliances, low flow water fixtures, boilers retrocommissioning, new programmable thermostats, lighting upgrades, and all new windows.

Iconergy’s design-build scope of work included new appliances, low flow water fixtures, boilers retrocommissioning, new programmable thermostats, lighting upgrades, and all new windows.

Read More

Empowerment on Logan

Iconergy's design-build retrofit scope of work for this character-filled apartment property included the following: New LED lighting inside and out, low flow water fixtures, and weatherization.

Iconergy’s design-build retrofit scope of work for this character-filled apartment property included the following: New LED lighting inside and out, low flow water fixtures, and weatherization.

Read More

Auraria Higher Education Center, Science Building

Retro-commissioning services were performed for the 116,000 existing science building and commissioning services were performed for the 197,227 square feet of new construction. The science buildings house teaching and research spaces for biology, anthropology, chemistry, earth sciences, and math and computer sciences. The renovation project achieved LEED BD+C: New Construction v2 – LEED 2.2 Gold…

Read More

Prowers Medical Center

Iconergy provided forensic MEP investigation at this regional hospital in rural Colorado as part of a turnkey retro-commissioning study to determine which building systems were and were not working according to healthcare and PMC’s own standards. The engineering study led to both a design-build retrofit project and a retro-commissioning implementation project. Together these implementation efforts…

Read More

Bromley East Charter School

Commissioning services of the 93,526 square feet of existing space and the 34,491 square foot addition was performed for the school serving students in 6th – 12th grade. A retro-commissioning HVAC assessment of the existing equipment was also performed to provide an understanding of the state of operation of existing HVAC equipment prior to integration…

Read More

Jefferson County Public Schools, Arvada West High School

Retro-Commissioning services were performed to investigate the central heating and cooling plant operation as well as rooftop unit operation at the high school. Iconergy staff identified five opportunities that were calculated to reduce annual energy demand by 457,708 kWh. Iconergy also performed commissioning on this project upon its completion.

Retro-Commissioning services were performed to investigate the central heating and cooling plant operation as well as rooftop unit operation at the high school. Iconergy staff identified five opportunities that were calculated to reduce annual energy demand by 457,708 kWh. Iconergy also performed commissioning on this project upon its completion.

Read More